![](https://freight.cargo.site/t/original/i/2d55a2c95ccea406c681ce302b7624d90915eff1a87a61892a6dded7d6120189/mock1_a.jpg)
![](https://freight.cargo.site/t/original/i/39c7a8591d5850fcb7d1d4fcc3d13ce2502b919a70546998acf26274f40b0880/mock1_b.jpg)
![](https://freight.cargo.site/t/original/i/a4bb237b790178e764ca7fe54f65d4119a32ddb1f9d7e4a186279088f19a34d2/mural_sketch1-01.jpg)
![](https://freight.cargo.site/t/original/i/33253d644cbb11a550a6d97b2f566761e054a9bd7086d4800675d2a5ffa91654/mural_sketch1-02.jpg)
![](https://freight.cargo.site/t/original/i/0dd805ec5f9f2a314c4ab51a3f36e2e4d15be9b2fc168221946607f495013bdf/weeds-to-print_v2_1.jpg)
![](https://freight.cargo.site/t/original/i/4c2ab9c0c8d7ebf1a508a3c66fab1e9bc9d4fd0f278c7433934a85964b417c41/000021580022-1.jpg)
![](https://freight.cargo.site/t/original/i/816584274568087c37491513eb680d4efbf87100f82fe8eaea89b45e1b952f17/000021570021.jpg)
![](https://freight.cargo.site/t/original/i/33e19a6a6c28eb71414b997ff53118b9427480605f349b57b1a9d1ef33e350b0/000021570018-1.jpg)
![](https://freight.cargo.site/t/original/i/dbd0d823b2b46b803a4fcc2fd0387bd329e73da308e0fd516d7787a04e7b74f6/000021570022-1.jpg)
![](https://freight.cargo.site/t/original/i/c17273106604fda7064be0db4aad4e479ee15ec2c4244e2eba0f5367bf1bfb9d/000021570011-1.jpg)
![](https://freight.cargo.site/t/original/i/fd21591dd86b277554c225e6bf17509d5b0ff8564dbc65f3f36e9952ba262ab8/000021580021.jpg)
SAN PABLO MURAL
Mural
Mural in Berkeley California, a collaboration between GRL GRP and @ifthenstudio. IF/THEN studio painted this abandonded building pink, then GRL GRP wheat pasted acanned images of local flora or “weeds” onto the building. A maximized version of the process of natural reclaimation. The building was later demolished in March 2022.
Mural
Mural in Berkeley California, a collaboration between GRL GRP and @ifthenstudio. IF/THEN studio painted this abandonded building pink, then GRL GRP wheat pasted acanned images of local flora or “weeds” onto the building. A maximized version of the process of natural reclaimation. The building was later demolished in March 2022.